Trim Acoustics technical expertise was required by Gama Construction when faced with sound proofing a very large wedding venue they were building in North London.

No expense was spared in the construction of this venue, including nearly 2000m2 of SRS Maxiboard system to ensure the soundproofing met the same standards as the lavish exterior.

The two function rooms required a very high level of sound reduction so they would not disturb each other or the surrounding residents.

Contact Gama construction.